What is the first step in performing a hydrostatic test?

  1. Check the pressure gauge

  2. Fill the boiler with water until it spills

  3. Inspect all valves and connections

  4. Heat the water to boiling

The correct answer is: Fill the boiler with water until it spills

Filling the boiler with water until it spills is indeed the first step in performing a hydrostatic test. This step ensures that the boiler is completely filled, removing any air pockets that could affect the test results. A proper fill is crucial because the hydrostatic test is designed to check for leaks and weaknesses in the boiler's structure under pressure. By filling the boiler until water spills out, you verify that the system is completely saturated, which allows for an accurate assessment of its integrity when pressure is applied. This step maximizes the effectiveness of the test by ensuring that the pressure is exerted evenly throughout the entire system, allowing any leaks to be easily identified during the testing process. Other steps, such as checking the pressure gauge or inspecting valves and connections, are certainly important and follow the initial filling, but they cannot replace the necessity of preparing the boiler by ensuring it is filled with water first. Heating the water to boiling is not applicable in the context of a hydrostatic test, which relies on water pressure, not steam or thermal expansion, to assess the boiler's condition.